SOS Restoration of Ventura County carries the loss from framing to final coat. We file the permit and hand you one written price. It is the same crew that dried the house after water, fire or storm.
somebody who can dispatch, not a recording
water pulled, smoke cleared, rooms rebuilt
from the coast to the backcountry of Ventura County
IICRC #70194273
CSLB #1131134. What the rebuild costs, and the first call, both start on the contact page. Call (805) 427-9039.
Yes, and it is the same crew, not a partner firm with a similar name.
Reconstruction is the sixth of six lines this company runs. Demolition and drying run under IICRC #70194273. Everything after runs under CSLB #1131134. That is one phone call instead of two contracts.
No. That rebuild is still open ground, and the county propped two doors open.
The 2024 fire near Balcom Canyon ran to 19,904 acres and destroyed 243 structures, most on unincorporated land. The county dropped the zoning-clearance step for fire rebuilds, so the application goes straight into Building and Safety.
Rough work first, finish work second, because an inspector sees the middle.
A house from the sixties has one gate ahead of it. Nothing comes down until the lab answers on the old material. Past that, cut framing goes back, then wiring and ducting are left visible for the city.
We do, in whichever of eleven jurisdictions your house sits in. Ten working days to nine weeks.
Plan check is the desk where drawings wait for approval. It is the stretch nobody warns you about. The eleven counters do not behave alike. Camarillo stopped taking paper plans, so its queue runs differently.
Because a rebuild sold by the hour is not a legal contract in California.
State law needs a Contract Price heading with the amount in dollars, covering labor and materials together. So the construction half reaches you as one number, agreed before anybody picks up a tool.
Not necessarily. After a declared emergency the floor is three years.
The insurance code fixes how long you have to collect full replacement cost. Ordinarily twelve months. Where the loss relates to a declared emergency it is not less than thirty-six, with six-month extensions for permit delays.
Two things, both checkable from your phone in a minute.
First, the license number, which California requires in every contract and advertisement. Ours are CSLB #1131134 and IICRC #70194273. Second, what that number is allowed to cover, because not every builder’s license reaches every part of a rebuild.
A kitchen you simply want changed is a remodeler’s work, not ours.
We carry losses: what the water, the fire or the smoke took, put back the way it was. A remodel starts from a drawing and a wish, and that is another trade’s morning.
At the walk-through, with three things past it that were never ours to settle.
We carry it to framing through final coat, and a walk where anything you point at gets fixed. A structural change goes to an engineer first. The jurisdiction’s inspector signs the card, not us.
Eleven permit counters cover this county: the ten cities and the county itself for the ground in between. We file in whichever one your address answers to.
The phone number carries the whole message. What you add only tells us which truck to load and how far it drives.
The last morning on a rebuild is quiet: no plastic, no machines, a room that gives nothing away.